Step 04

Underground Utilities

Trench and install water lines, sewer lines, electrical conduit, and E1 grinder pumps, one contract, one crew, no separate subs to coordinate.

Water, sewer, and electrical work on a site usually means three separate contractors on three separate schedules. CMJ handles all of it under one contract, because Chris holds the licenses himself instead of subbing the work out.

That means fewer handoffs, fewer coordination gaps, and one crew that understands how all three trades connect, so drainage is solved before concrete, and utilities go in before finish grading.

  • Tennessee Licensed Electrician Licensed directly, not subcontracted.
  • Tennessee Licensed Plumber Licensed directly, not subcontracted.
On The Job — Photos & Video
CMJ Excavation underground utility installation
Underground utility pipe installation
Underground utility connection
Finished underground utility trench
What's Included
  • 01 Trenching for water, sewer, and electrical lines on one schedule.
  • 02 Licensed installation of water, sewer, and electrical connections.
  • 03 Grinder pump installation where site conditions require it.
  • 04 Backfill and grade check before the next trade moves in.
The Coordination Guarantee

One crew handles water, sewer, and electrical, so nothing gets installed out of order or missed between separate subs.

The Underground Utilities Cluster

Not sure which one fits your project?

Call Chris: (865) 265-9339