Site Prep

Footers

Concrete footing trenches, dug to exact depth and alignment before the pour, so what's underneath your foundation is right the first time.

Footers carry the weight of everything built above them. If the trench depth or alignment is off, that mistake gets buried under concrete and shows up later as a structural problem, not a quick fix.

CMJ digs footer trenches to exact spec off your plans, and Chris checks depth and alignment before the pour crew is called. It's a small step that prevents a big, expensive one from going wrong later.

On The Job — Photos & Video
[ + ]
Photo 1
Wide shot, footer
trench layout
Video
Digging a
footer trench
[ + ]
Photo 2
Trench close-up,
depth reference
[ + ]
Photo 3
Alignment / string line check
[ + ]
Photo 4
Ready-for-pour footer trench
What's Included
  • 01Trench layout confirmed against your site plans.
  • 02Excavation to exact depth for the footer spec.
  • 03Alignment check along the full trench line.
  • 04Final sign-off with Chris before the pour crew arrives.
The No Shortcuts Guarantee

If depth or alignment isn't right, it gets fixed before it's called ready. Not after your pour crew finds out.

Related Services

Not sure which service matches your project scope?

Call Chris: (423) 603-5282